Error message

Notice: Undefined offset: 1 in counter_get_browser() (line 70 of /home/pmpmllogin/public_html/sites/all/modules/counter/counter.lib.inc).

Archive Dashboard

March
31-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 650 541 144 1335
3 Off Road Buses 533 112 56 701
4 Off Road Buses % 45% 17% 28% 34%
5 Breakdown No. 141 129 27 297
6 Breakdown % (Fleet) 22% 24% 19% 22%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 917399
9 Passenger Per Bus Per Day - - - 687
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
30-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 674 546 142 1362
3 Off Road Buses 509 107 58 674
4 Off Road Buses % 43% 16% 29% 33%
5 Breakdown No. 151 139 25 315
6 Breakdown % (Fleet) 22% 25% 18% 23%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 908186
9 Passenger Per Bus Per Day - - - 667
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
29-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 612 535 140 1287
3 Off Road Buses 571 118 60 749
4 Off Road Buses % 48% 18% 30% 37%
5 Breakdown No. 167 144 34 345
6 Breakdown % (Fleet) 27% 27% 24% 27%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 938369
9 Passenger Per Bus Per Day - - - 729
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
28-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 516 506 134 1156
3 Off Road Buses 667 147 66 880
4 Off Road Buses % 56% 23% 33% 43%
5 Breakdown No. 110 91 25 226
6 Breakdown % (Fleet) 21% 18% 19% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 679892
9 Passenger Per Bus Per Day - - - 588
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
27-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 647 544 149 1340
3 Off Road Buses 536 109 51 696
4 Off Road Buses % 45% 17% 26% 34%
5 Breakdown No. 176 151 21 348
6 Breakdown % (Fleet) 27% 28% 14% 26%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 979565
9 Passenger Per Bus Per Day - - - 731
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
26-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 597 543 146 1286
3 Off Road Buses 586 110 54 750
4 Off Road Buses % 50% 17% 27% 37%
5 Breakdown No. 127 110 14 251
6 Breakdown % (Fleet) 21% 20% 10% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 841235
9 Passenger Per Bus Per Day - - - 654
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
25-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 640 550 149 1339
3 Off Road Buses 543 103 51 697
4 Off Road Buses % 46% 16% 26% 34%
5 Breakdown No. 158 137 27 322
6 Breakdown % (Fleet) 25% 25% 18% 24%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 907326
9 Passenger Per Bus Per Day - - - 678
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
24-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 653 548 149 1350
3 Off Road Buses 530 105 51 686
4 Off Road Buses % 45% 16% 26% 34%
5 Breakdown No. 133 128 36 297
6 Breakdown % (Fleet) 20% 23% 24% 22%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 955945
9 Passenger Per Bus Per Day - - - 708
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
23-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 669 550 149 1368
3 Off Road Buses 514 103 51 668
4 Off Road Buses % 43% 16% 26% 33%
5 Breakdown No. 144 135 30 309
6 Breakdown % (Fleet) 22% 25% 20% 23%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 991467
9 Passenger Per Bus Per Day 0- - - 725
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
22-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 636 549 150 1335
3 Off Road Buses 547 104 50 701
4 Off Road Buses % 46% 16% 25% 34%
5 Breakdown No. 160 123 13 296
6 Breakdown % (Fleet) 25% 22% 9% 22%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 984243
9 Passenger Per Bus Per Day - - - 737
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
21-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 643 530 147 1320
3 Off Road Buses 540 123 53 716
4 Off Road Buses % 46% 19% 27% 35%
5 Breakdown No. 125 116 16 257
6 Breakdown % (Fleet) 19% 22% 11% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 997471
9 Passenger Per Bus Per Day - - - 756
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
21-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 643 530 147 1320
3 Off Road Buses 540 123 53 716
4 Off Road Buses % 46% 19% 27% 35%
5 Breakdown No. 125 116 16 257
6 Breakdown % (Fleet) 19% 22% 11% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 997471
9 Passenger Per Bus Per Day - - - 756
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
20-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 656 526 144 1326
3 Off Road Buses 527 127 56 710
4 Off Road Buses % 45% 19% 28% 35%
5 Breakdown No. 125 118 19 262
6 Breakdown % (Fleet) 19% 22% 13% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1085022
9 Passenger Per Bus Per Day - - - 818
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
19-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 559 524 148 1231
3 Off Road Buses 624 129 52 805
4 Off Road Buses % 53% 20% 26% 40%
5 Breakdown No. 132 97 19 248
6 Breakdown % (Fleet) 24% 19% 13% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 857317
9 Passenger Per Bus Per Day - - - 696
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
18-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1183 653 200 2036
2 On Road Buses 626 518 138 1282
3 Off Road Buses 557 135 62 754
4 Off Road Buses % 47% 21% 31% 37%
5 Breakdown No. 104 91 13 208
6 Breakdown % (Fleet) 17% 18% 9% 16%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 954909
9 Passenger Per Bus Per Day - - - 745
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
17-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 612 518 139 1269
3 Off Road Buses 580 135 61 776
4 Off Road Buses % 49% 21% 31% 38%
5 Breakdown No. 116 118 18 252
6 Breakdown % (Fleet) 19% 23% 13% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 955680
9 Passenger Per Bus Per Day - - - 753
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
16-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 651 501 139 1291
3 Off Road Buses 541 152 61 754
4 Off Road Buses % 45% 23% 31% 37%
5 Breakdown No. 116 111 21 248
6 Breakdown % (Fleet) 18% 22% 15% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1065525
9 Passenger Per Bus Per Day - - - 825
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
15-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 620 500 138 1258
3 Off Road Buses 572 153 62 787
4 Off Road Buses % 48% 23% 31% 38%
5 Breakdown No. 112 95 12 219
6 Breakdown % (Fleet) 18% 19% 9% 17%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1068360
9 Passenger Per Bus Per Day - - - 849
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
14-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 653 499 130 1282
3 Off Road Buses 539 154 70 763
4 Off Road Buses % 45% 24% 35% 37%
5 Breakdown No. 132 98 9 239
6 Breakdown % (Fleet) 20% 20% 7% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1219043
9 Passenger Per Bus Per Day - - - 951
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
13-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 617 503 149 1269
3 Off Road Buses 575 150 51 776
4 Off Road Buses % 48% 23% 26% 38%
5 Breakdown No. 70 86 15 171
6 Breakdown % (Fleet) 11% 17% 10% 13%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 740380
9 Passenger Per Bus Per Day - - - 583
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
12-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 572 519 150 1241
3 Off Road Buses 620 134 50 804
4 Off Road Buses % 52% 21% 25% 39%
5 Breakdown No. 98 87 9 194
6 Breakdown % (Fleet) 17% 17% 6% 16%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 781275
9 Passenger Per Bus Per Day - - - 630
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
11-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 623 540 152 1315
3 Off Road Buses 569 113 48 730
4 Off Road Buses % 48% 17% 24% 36%
5 Breakdown No. 109 97 13 219
6 Breakdown % (Fleet) 17% 18% 9% 17%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 948387
9 Passenger Per Bus Per Day - - - 721
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
10-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 631 547 153 1331
3 Off Road Buses 561 106 47 714
4 Off Road Buses % 47% 16% 24% 35%
5 Breakdown No. 94 123 16 233
6 Breakdown % (Fleet) 15% 22% 10% 18%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1012063
9 Passenger Per Bus Per Day - - - 760
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
09-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 669 554 154 1377
3 Off Road Buses 523 99 46 668
4 Off Road Buses % 44% 15% 23% 33%
5 Breakdown No. 120 137 10 267
6 Breakdown % (Fleet) 18% 25% 6% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1056412
9 Passenger Per Bus Per Day - - - 767
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
08-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 665 542 153 1360
3 Off Road Buses 527 111 47 685
4 Off Road Buses % 44% 17% 24% 33%
5 Breakdown No. 143 125 7 275
6 Breakdown % (Fleet) 22% 23% 5% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1051991
9 Passenger Per Bus Per Day - - - 774
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
07-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 607 552 150 1309
3 Off Road Buses 585 101 50 736
4 Off Road Buses % 49% 15% 25% 36%
5 Breakdown No. 114 137 17 268
6 Breakdown % (Fleet) 19% 25% 11% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1058592
9 Passenger Per Bus Per Day - - - 809
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
06-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200` 2045
2 On Road Buses 626 537 153 1316
3 Off Road Buses 566 116 47 729
4 Off Road Buses % 47% 18% 24% 36%
5 Breakdown No. 117 129 20 266
6 Breakdown % (Fleet) 19% 24% 13% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1153722
9 Passenger Per Bus Per Day - - - 877
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
04-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 653 548 153 1354
3 Off Road Buses 539 105 47 691
4 Off Road Buses % 45% 16% 24% 34%
5 Breakdown No. 120 122 8 250
6 Breakdown % (Fleet) 18% 22% 5% 18%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 966837
9 Passenger Per Bus Per Day - - - 714
10 Total Schedule km Planned - - - 375585
11 Actual Schedule km operated - - - 313162
12 Schedules k.m . Cancelled - - - 62423
13 Schedules k.m . Cancelled % - - - 17%
05-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 562 513 151 1226
3 Off Road Buses 630 140 49 819
4 Off Road Buses % 53% 21% 25% 40%
5 Breakdown No. 99 89 13 201
6 Breakdown % (Fleet) 18% 17% 9% 16%
7 Breakdown per 10,000km - - - -
8 Ridership 868507 - - 868507
9 Passenger Per Bus Per Day 1545 0 0 708
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
03-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 642 546 152 1340
3 Off Road Buses 550 107 48 705
4 Off Road Buses % 46% 16% 24% 34%
5 Breakdown No. 117 103 27 247
6 Breakdown % (Fleet) 18% 19% 18% 18%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 988090
9 Passenger Per Bus Per Day 0 0 0 737
10 Total Schedule km Planned - - - 376376
11 Actual Schedule km operated - - - 309391
12 Schedules k.m . Cancelled - - - 66985
13 Schedules k.m . Cancelled % - - - 18%
02-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 638 546 155 1339
3 Off Road Buses 554 107 45 706
4 Off Road Buses % 46% 16% 23% 35%
5 Breakdown No. 129 127 23 279
6 Breakdown % (Fleet) 20% 23% 15% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1094131
9 Passenger Per Bus Per Day - - - 817
10 Total Schedule km Planned - - - 376376
11 Actual Schedule km operated - - - 309401
12 Schedules k.m . Cancelled - - - 66975
13 Schedules k.m . Cancelled % - - - 18%
01-March-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 612 535 155 1302
3 Off Road Buses 580 118 45 743
4 Off Road Buses % 49% 18% 23% 36%
5 Breakdown No. 119 124 17 260
6 Breakdown % (Fleet) 19% 23% 11% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1092681
9 Passenger Per Bus Per Day - - - 839
10 Total Schedule km Planned - - - 377119
11 Actual Schedule km operated - - - 300482
12 Schedules k.m . Cancelled - - - 76637
13 Schedules k.m . Cancelled % - - - 20%
February
28-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 607 527 148 1282
3 Off Road Buses 585 126 52 763
4 Off Road Buses % 49% 19% 26% 37%
5 Breakdown No. 117 139 19 275
6 Breakdown % (Fleet) 19% 26% 13% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1057008
9 Passenger Per Bus Per Day - - - 824
10 Total Schedule km Planned - - - 377123
11 Actual Schedule km operated - - - 292260
12 Schedules k.m . Cancelled - - - 84863
13 Schedules k.m . Cancelled % - - - 23%
27-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 664 542 142 1348
3 Off Road Buses 528 111 58 697
4 Off Road Buses % 44% 17% 29% 34%
5 Breakdown No. 142 134 12 288
6 Breakdown % (Fleet) 21% 25% 8% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1069839
9 Passenger Per Bus Per Day - - - 794
10 Total Schedule km Planned - - - 377123
11 Actual Schedule km operated - - - 304828
12 Schedules k.m . Cancelled - - - 72295
13 Schedules k.m . Cancelled % - - - 19%
26-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 584 529 152 1265
3 Off Road Buses 608 124 48 780
4 Off Road Buses % 51% 19% 24% 38%
5 Breakdown No. 116 110 22 248
6 Breakdown % (Fleet) 20% 21% 14% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 824404
9 Passenger Per Bus Per Day - - - 652
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
26-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 584 529 152 1265
3 Off Road Buses 608 124 48 780
4 Off Road Buses % 51% 19% 24% 38%
5 Breakdown No. 109 83 22 214
6 Breakdown % (Fleet) 19% 16% 14% 17%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 824404
9 Passenger Per Bus Per Day - - - 652
10 Total Schedule km Planned - - - 351502
11 Actual Schedule km operated - - - 299777
12 Schedules k.m . Cancelled - - - 51725
13 Schedules k.m . Cancelled % - - - 15%
25-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 607 537 154 1298
3 Off Road Buses 585 116 46 747
4 Off Road Buses % 49% 18% 23% 37%
5 Breakdown No. 109 91 14 214
6 Breakdown % (Fleet) 18% 17% 9% 16%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 887538
9 Passenger Per Bus Per Day - - - 684
10 Total Schedule km Planned - -- - 356343
11 Actual Schedule km operated - - - 300663
12 Schedules k.m . Cancelled - - - 55680
13 Schedules k.m . Cancelled % - - - 16%
24-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 587 539 133 1259
3 Off Road Buses 605 114 67 786
4 Off Road Buses % 51% 17% 34% 38%
5 Breakdown No. 118 122 16 256
6 Breakdown % (Fleet) 20% 23% 12% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 864451
9 Passenger Per Bus Per Day - - - 687
10 Total Schedule km Planned - - - 358387
11 Actual Schedule km operated - - - 296732
12 Schedules k.m . Cancelled - - - 61655
13 Schedules k.m . Cancelled % - - - 17%
20-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 699 530 142 1371
3 Off Road Buses 493 123 58 674
4 Off Road Buses % 41% 19% 29% 33%
5 Breakdown No. 112 124 13 249
6 Breakdown % (Fleet) 16% 23% 9% 18%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 988202
9 Passenger Per Bus Per Day - - - 721
10 Total Schedule km Planned - - - 357986
11 Actual Schedule km operated - - - 227118
12 Schedules k.m . Cancelled - - - 130868
13 Schedules k.m . Cancelled % - - - 37%
23-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 592 523 153 1268
3 Off Road Buses 600 130 47 777
4 Off Road Buses % 50% 20% 24% 38%
5 Breakdown No. 137 140 22 299
6 Breakdown % (Fleet) 23% 27% 14% 24%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 969728
9 Passenger Per Bus Per Day - - - 765
10 Total Schedule km Planned - - - 377078
11 Actual Schedule km operated - - - 290464
12 Schedules k.m . Cancelled - - - 86614
13 Schedules k.m . Cancelled % - - - 23%
22-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 642 534 149 1325
3 Off Road Buses 550 119 51 720
4 Off Road Buses % 46% 18% 26% 35%
5 Breakdown No. 137 99 20 256
6 Breakdown % (Fleet) 21% 19% 13% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1077958
9 Passenger Per Bus Per Day - - - 814
10 Total Schedule km Planned - - -- 377398
11 Actual Schedule km operated - - - 302362
12 Schedules k.m . Cancelled - - - 75036
13 Schedules k.m . Cancelled % - - - 20%
22-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 642 534 149 1325
3 Off Road Buses 550 119 51 720
4 Off Road Buses % 46% 18% 26% 35%
5 Breakdown No. 137 99 20 256
6 Breakdown % (Fleet) 21% 19% 13% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1077958
9 Passenger Per Bus Per Day - - - 814
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
21-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 353 475 96 924
3 Off Road Buses 839 178 104 1121
4 Off Road Buses % 70% 27% 52% 55%
5 Breakdown No. 67 82 5 154
6 Breakdown % (Fleet) 19% 17% 5% 17%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 780460
9 Passenger Per Bus Per Day - -- - 845
10 Total Schedule km Planned - - - 348499
11 Actual Schedule km operated - - - 221868
12 Schedules k.m . Cancelled - - - 126631
13 Schedules k.m . Cancelled % - - - 36%
19-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 569 506 148 1223
3 Off Road Buses 623 147 52 822
4 Off Road Buses % 52% 23% 26% 40%
5 Breakdown No. 127 94 23 244
6 Breakdown % (Fleet) 22% 19% 16% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 860737
9 Passenger Per Bus Per Day - - - 704
10 Total Schedule km Planned - - - 352332
11 Actual Schedule km operated - - - 286020
12 Schedules k.m . Cancelled - - - 66312
13 Schedules k.m . Cancelled % - - - 19%
18-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 653 525 152 1330
3 Off Road Buses 539 128 48 715
4 Off Road Buses % 45% 20% 24% 35%
5 Breakdown No. 119 105 21 245
6 Breakdown % (Fleet) 18% 20% 14% 18%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 973603
9 Passenger Per Bus Per Day 0- 0 0 732
10 Total Schedule km Planned - - - 385652
11 Actual Schedule km operated - - - 310153
12 Schedules k.m . Cancelled - - - 75499
13 Schedules k.m . Cancelled % - - - 20%
17-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 619 524 149 1292
3 Off Road Buses 573 129 51 753
4 Off Road Buses % 48% 20% 26% 37%
5 Breakdown No. 134 110 22 266
6 Breakdown % (Fleet) 22% 21% 15% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1000753
9 Passenger Per Bus Per Day - - - 775
10 Total Schedule km Planned - - - 377124
11 Actual Schedule km operated - - - 295298
12 Schedules k.m . Cancelled - - - 81826
13 Schedules k.m . Cancelled % - - - 22%
16-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 638 512 152 1302
3 Off Road Buses 554 141 48 743
4 Off Road Buses % 46% 22% 24% 36%
5 Breakdown No. 129 114 16 259
6 Breakdown % (Fleet) 20% 22% 11% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1079521
9 Passenger Per Bus Per Day - -- - 829
10 Total Schedule km Planned - - - 376389
11 Actual Schedule km operated - - - 293893
12 Schedules k.m . Cancelled - - - 82496
13 Schedules k.m . Cancelled % - - - 22%
15-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 627 524 154 1305
3 Off Road Buses 565 129 46 740
4 Off Road Buses % 47% 20% 23% 36%
5 Breakdown No. 121 116 26 263
6 Breakdown % (Fleet) 19% 22% 17% 20%
7 Breakdown per 10,000km - - - -
8 Ridership 1039832 - - 1039832
9 Passenger Per Bus Per Day 1658 0 0 797
10 Total Schedule km Planned - - - 377124
11 Actual Schedule km operated - - - 296345
12 Schedules k.m . Cancelled - - - 80779
13 Schedules k.m . Cancelled % - - - 21%
14-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 616 525 149 1290
3 Off Road Buses 576 128 51 755
4 Off Road Buses % 48% 20% 26% 37%
5 Breakdown No. 116 112 26 254
6 Breakdown % (Fleet) 19% 21% 17% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1056513
9 Passenger Per Bus Per Day - - - 819
10 Total Schedule km Planned - - - 377123
11 Actual Schedule km operated - - - 291281
12 Schedules k.m . Cancelled - - - 85842
13 Schedules k.m . Cancelled % - - - 23%
13-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 627 539 148 1314
3 Off Road Buses 565 114 52 731
4 Off Road Buses % 47% 17% 26% 36%
5 Breakdown No. 127 124 27 278
6 Breakdown % (Fleet) 20% 23% 18% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1154525
9 Passenger Per Bus Per Day - - - 879
10 Total Schedule km Planned - - - 377124
11 Actual Schedule km operated - - - 298659
12 Schedules k.m . Cancelled - - - 78465
13 Schedules k.m . Cancelled % - - - 21%
12-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 546 516 145 1207
3 Off Road Buses 646 137 55 838
4 Off Road Buses % 54% 21% 28% 41%
5 Breakdown No. 101 77 10 188
6 Breakdown % (Fleet) 18% 15% 7% 16%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 913427
9 Passenger Per Bus Per Day - - - 757
10 Total Schedule km Planned - - - 349597
11 Actual Schedule km operated - - - 288661
12 Schedules k.m . Cancelled - - - 60936
13 Schedules k.m . Cancelled % - - - 17%
12-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 546 516 145 1207
3 Off Road Buses 646 137 55 838
4 Off Road Buses % 54% 21% 28% 41%
5 Breakdown No. 101 77 10 188
6 Breakdown % (Fleet) 18% 15% 7% 16%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 913427
9 Passenger Per Bus Per Day - - - 757
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
11-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 612 529 154 1295
3 Off Road Buses 580 124 46 750
4 Off Road Buses % 49% 19% 23% 37%
5 Breakdown No. 84 125 6 215
6 Breakdown % (Fleet) 14% 24% 4% 17%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 984707
9 Passenger Per Bus Per Day - - - 760
10 Total Schedule km Planned - - - 354962
11 Actual Schedule km operated - - - 298863
12 Schedules k.m . Cancelled - - - 56099
13 Schedules k.m . Cancelled % - - - 16%
10-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 627 538 152 1317
3 Off Road Buses 565 115 48 728
4 Off Road Buses % 47% 18% 24% 36%
5 Breakdown No. 117 117 35 269
6 Breakdown % (Fleet) 19% 22% 23% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1022749
9 Passenger Per Bus Per Day - - - 777
10 Total Schedule km Planned - - - 377177
11 Actual Schedule km operated - - - 295179
12 Schedules k.m . Cancelled - - - 81998
13 Schedules k.m . Cancelled % - - - 22%
09-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 697 544 155 1396
3 Off Road Buses 495 109 45 649
4 Off Road Buses % 42% 17% 23% 32%
5 Breakdown No. 138 127 23 288
6 Breakdown % (Fleet) 20% 23% 15% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1108730
9 Passenger Per Bus Per Day 0 0 0 794
10 Total Schedule km Planned - - - 377177
11 Actual Schedule km operated - - - 312246
12 Schedules k.m . Cancelled - - - 64931
13 Schedules k.m . Cancelled % - - - 17%
08-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 646 546 154 1346
3 Off Road Buses 546 107 46 699
4 Off Road Buses % 46% 16% 23% 34%
5 Breakdown No. 148 134 17 299
6 Breakdown % (Fleet) 23% 25% 11% 22%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1065454
9 Passenger Per Bus Per Day - - - 792
10 Total Schedule km Planned - - - 377177
11 Actual Schedule km operated - - - 306775
12 Schedules k.m . Cancelled - - - 70402
13 Schedules k.m . Cancelled % - - - 19%
07-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 652 546 157 1355
3 Off Road Buses 540 107 43 690
4 Off Road Buses % 45% 16% 22% 34%
5 Breakdown No. 122 118 18 258
6 Breakdown % (Fleet) 19% 22% 11% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1094169
9 Passenger Per Bus Per Day - - - 808
10 Total Schedule km Planned - - - 377490
11 Actual Schedule km operated - - - 302401
12 Schedules k.m . Cancelled - - - 75089
13 Schedules k.m . Cancelled % - - - 20%
06-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 648 544 157 1349
3 Off Road Buses 544 109 43 696
4 Off Road Buses % 46% 17% 22% 34%
5 Breakdown No. 131 149 16 296
6 Breakdown % (Fleet) 20% 27% 10% 22%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1224856
9 Passenger Per Bus Per Day - - - 908
10 Total Schedule km Planned - - - 377176
11 Actual Schedule km operated - - - 300699
12 Schedules k.m . Cancelled - - - 76477
13 Schedules k.m . Cancelled % - - - 20%
05-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 557 526 153 1236
3 Off Road Buses 635 127 47 809
4 Off Road Buses % 53% 19% 24% 40%
5 Breakdown No. 101 80 11 192
6 Breakdown % (Fleet) 18% 15% 7% 16%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 955397
9 Passenger Per Bus Per Day - - - 773
10 Total Schedule km Planned - - - 350010
11 Actual Schedule km operated - - - 294640
12 Schedules k.m . Cancelled - - - 55370
13 Schedules k.m . Cancelled % - - - 16%
04-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 658 540 157 1355
3 Off Road Buses 534 113 43 690
4 Off Road Buses % 45% 17% 22% 34%
5 Breakdown No. 124 106 18 248
6 Breakdown % (Fleet) 19% 20% 11% 18%
7 Breakdown per 10,000km 0 0 0 0
8 Ridership - - - 1029113
9 Passenger Per Bus Per Day - 0 0 759
10 Total Schedule km Planned - - - 374614
11 Actual Schedule km operated - - - 306721
12 Schedules k.m . Cancelled - - - 67893
13 Schedules k.m . Cancelled % - - - 18%
03-Febuary-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 623 533 154 1310
3 Off Road Buses 569 120 46 735
4 Off Road Buses % 48% 18% 23% 36%
5 Breakdown No. 135 124 27 286
6 Breakdown % (Fleet) 22% 23% 18% 22%
7 Breakdown per 10,000km -- -- -- --
8 Ridership -- -- -- 1052479
9 Passenger Per Bus Per Day -- -- -- 803
10 Total Schedule km Planned -- -- -- 377177
11 Actual Schedule km operated -- -- -- 297892
12 Schedules k.m . Cancelled -- -- -- 79285
13 Schedules k.m . Cancelled % -- -- -- 21%
02-February-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 662 539 156 1357
3 Off Road Buses 530 114 44 688
4 Off Road Buses % 44% 17% 22% 34%
5 Breakdown No. 126 118 27 271
6 Breakdown % (Fleet) 19% 22% 17% 20%
7 Breakdown per 10,000km - - - -
8 Ridership - - - 1108172
9 Passenger Per Bus Per Day - - 0 817
10 Total Schedule km Planned - - - 377177
11 Actual Schedule km operated - - - 304552
12 Schedules k.m . Cancelled - - - 72625
13 Schedules k.m . Cancelled % - - - 19%
01-February-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 627 526 155 1308
3 Off Road Buses 565 127 45 737
4 Off Road Buses % 47% 19% 23% 36%
5 Breakdown No. 142 116 16 274
6 Breakdown % (Fleet) 23% 22% 10% 21%
7 Breakdown per 10,000km 0 0 0 0
8 Ridership - - - 1050791
9 Passenger Per Bus Per Day 0 0 0 803
10 Total Schedule km Planned - - - 377176
11 Actual Schedule km operated - - - 301500
12 Schedules k.m . Cancelled - - - 75676
13 Schedules k.m . Cancelled % 0% 0 0 20%
January
31-January-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 668 533 149 1350
3 Off Road Buses 524 120 51 695
4 Off Road Buses % 44% 18% 26% 34%
5 Breakdown No. 131 98 28 257
6 Breakdown % (Fleet) 20% 18% 19% 19%
7 Breakdown per 10,000km - - - -
8 Ridership 0 0 0 0
9 Passenger Per Bus Per Day 0 0 0 0
10 Total Schedule km Planned -- - - 376774
11 Actual Schedule km operated - - - 316879
12 Schedules k.m . Cancelled - - - 59895
13 Schedules k.m . Cancelled % - - - 16%
30-January-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 668 533 149 1350
3 Off Road Buses 524 120 51 695
4 Off Road Buses % 44% 18% 26% 34%
5 Breakdown No. 131 98 28 257
6 Breakdown % (Fleet) 20% 18% 19% 19%
7 Breakdown per 10,000km - - - -
8 Ridership - - - -
9 Passenger Per Bus Per Day 0 0 0 0
10 Total Schedule km Planned -0 - - 376908
11 Actual Schedule km operated - - - 303825
12 Schedules k.m . Cancelled - - - 730383
13 Schedules k.m . Cancelled % - - - 194%
26-January-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 661 543 154 1334
3 Off Road Buses 531 110 46 711
4 Off Road Buses %
5 Breakdown No. 117 89 11 217
6 Breakdown % (Fleet)
7 Breakdown per 10,000km
8 Ridership 0 0 0 895736
9 Passenger Per Bus Per Day 0 0 0 671
10 Total Schedule km Planned
11 Actual Schedule km operated
12 Schedules k.m . Cancelled 0 0 0 0
13 Schedules k.m . Cancelled %
25-January-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 661 543 154 1358
3 Off Road Buses 531 110 46 687
4 Off Road Buses % 45% 17% 23% 34%
5 Breakdown No. 135 125 24 284
6 Breakdown % (Fleet) 20% 23% 16% 21%
7 Breakdown per 10,000km - - - -
8 Ridership - - - -
9 Passenger Per Bus Per Day - - - -
10 Total Schedule km Planned - - - -
11 Actual Schedule km operated - - - -
12 Schedules k.m . Cancelled - - - -
13 Schedules k.m . Cancelled % - - - -
24-January-2017
Sr.No Performance Matrics Pmpml Hired PPP Total
1 Total Fleet 1192 653 200 2045
2 On Road Buses 651 537 155 1343
3 Off Road Buses 541 116 45 702
4 Off Road Buses %
5 Breakdown No. 116 110 27 253
6 Breakdown % (Fleet)
7 Breakdown per 10,000km
8 Ridership 0 0 0 1021605
9 Passenger Per Bus Per Day 0 0 0 761
10 Total Schedule km Planned
11 Actual Schedule km operated
12 Schedules k.m . Cancelled 0 0 0 0
13 Schedules k.m . Cancelled %